§ 16.16.410. Failure to obtain permit—Fees tripled.  


Latest version.
  • In addition to any other penalty imposed for failure to obtain a permit, when work on any gas, gas/mechanical installation or gas/mechanical system requiring a permit is commenced prior to the issuance of the required permit, the permit fee for such work shall be tripled; provided, that the triple fee penalty shall not be applied when, in the opinion of the director of codes administration, an emergency existed.

(Ord. 91-1527 § 2, 1991; Ord. 90-1253 § 1 (part), 1990; prior code § 19-1-62)