§ 16.16.410. Failure to obtain permit—Fees tripled.
Latest version.
In addition to any other penalty imposed for failure to obtain a permit, when work
on any gas, gas/mechanical installation or gas/mechanical system requiring a permit
is commenced prior to the issuance of the required permit, the permit fee for such
work shall be tripled; provided, that the triple fee penalty shall not be applied
when, in the opinion of the director of codes administration, an emergency existed.