§ 16.16.560. Notice of rejection.  


Latest version.
  • A.

    In the event of failure of a gas/mechanical installation to pass the required tests and inspection, notice of such failure shall be given the permittee and contractor and a gas/mechanical rejected notice shall be placed within the building, pending a reinspection and testing.

    B.

    It is unlawful for any person to remove a gas/mechanical rejected notice prior to satisfactory completion of the reinspection testing.

    C.

    When an inspection is rejected, codes administration will do two things:

    1.

    Place rejected notice at jobsite;

    2.

    Give notice to permittee.

(Ord. 90-1253 § 1 (part), 1990; prior code § 19-1-80)