§ 16.20.215. Plans prepared by others.  


Latest version.
  • Failure on the part of third parties to correct known defects in plans or specifications prepared by others shall not relieve the electrical contractor, master electrician, equipment contractor, electrical equipment installer, low-voltage contractor, or low-voltage wiring installer of responsibility for reporting such known defects to the metropolitan electrical inspector.

(Ord. 91-1558 § 8, 1991; prior code § 14-1-35.1)