§ 16.20.400. Notice of approval—When—Posted.  


Latest version.
  • Upon satisfactory completion of the roughing-in inspection and testing of an electrical installation or electrical system, notice of approval of such installation shall be posted in a conspicuous place within the building. Such notice shall be dated and properly signed by the person making the inspection.

(Prior code § 14-1-55)