§ 16.32.020. Establishment of boundary lines.  


Latest version.
  • The director of codes administration shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building or structure upon completion, prior to the issuance of the certificate of occupancy required by this chapter. Prior to the first inspection, the permittee shall establish the lot lines or boundary of the parcel by the placement of stakes or pins at each corner of the lot. Such markers are to remain in place during the construction.

(Prior code § 11-1-54)