§ 16.32.060. Inspections prerequisite to further work.


Latest version.
  • No work shall be done on any part of a building or structure beyond the point indicated in each successive inspection without first obtaining the written approval of the director of codes administration. Such written approval shall be given only after an inspection shall have been made of each successive step in the construction as indicated by each of the three inspections indicated in Section 16.32.030.

(Prior code § 11-1-56)