  • Grantee shall submit to the director of public works "as built" drawings of the portions of grantee's system located along the public right-of-way of a size and material satisfactory to the director of public works within one hundred twenty days after completion of construction of such portions. Grantee shall update such drawings within sixty days whenever material changes are made to grantee's system which impact the public right-of-way. Said drawings, set forth by utility quarter sections, shall at a minimum include cable routings and the location of amplifiers, power supplies and system monitor test points.

(Amdt. 1(7) to Ord. 94-1103, 7/19/94; Ord. 94-1103 § 5, 1994)