§ 16.28.156. Building shell finish-out permit.  


Latest version.
  • A.

    When application for a permit to erect or enlarge a building has been filed and pending issuance of such permit, the director of codes administration may, at his discretion, issue a special permit for finishing-out the interior of the shell of such building. This permit would include installing all interior finishes of each tenant space.

    B.

    The electrical, plumbing, and HVAC permits may be issued to complete finish out of the installation of each system.

    C.

    The partial permit for the tenant finish-out fee shall be not less than forty-five percent of the total building valuation as per Section 16.28.120 for a building that the total tenant area is substantiality less that the gross area of the building. If the tenant is basically equal to the gross area of the building, the partial permit for the tenant finish-out permit fee shall be not less than thirty percent of the total building valuation as per Section 16.28.120.

(Ord. BL2002-1142 § 26, 2002)